Apex AutoTech Pvt Ltd • Shift B • 14:00–22:00
Shift B Handover Report
Supervisor: Santosh Patil (Production In-Charge) • Generated automatically at shift close (zero spreadsheets)
Actual vs Planned Output
428 / 450
95.1% schedule adherence
Rejection / Scrap
3 units
0.7% rate (benchmark < 1.5%)
Total Downtime
24 mins
Planned & utility stops only
Unplanned Breakdown
0 mins
VMC-03 bearing caught early
Downtime Breakdown (24 mins total)
Planned tool insert index & setup
Planned
MSEDCL grid voltage fluctuation / DG synchronizer switch
Utility
Chip conveyor bin clearing
Routine
Unplanned breakdown downtime (Bearing alert caught early)
Prevented
Operator Productivity
| Operator | Machine | Units | Target % |
|---|---|---|---|
Sunil Gaikwad On schedule | VMC-01 | 112 | 102% |
Pravin Shinde On schedule | VMC-02 | 108 | 98% |
Mahesh Jadhav Insert adjusted | CNC Lathe 2 | 104 | 95% |